Drake Integrations performed Fundamental and Enhanced Commissioning services to meet LEED v2009 Interior Design and Construction (ID+C) requirements. Systems commissioned included Ductless Split-System Heat Pump Fan Coil Units and Outdoor Heat Pump, Exhaust Fans, Supply Fans and Lighting Controls including occupancy sensors, dimmers, and outdoor lighting control system with photocell. Drake Integrations was proud to serve as the CxA on this project which became the first ever LEED certified legal medical marijuana dispensary building on record by the USGBC obtaining LEED Silver certification in September 2016.
San Diego Community Newspaper Group - PLPCC StoryThe newly constructed Naval Air Station North Island Fitness Center provides Navy personnel with an 89,502 square foot fitness center, a 3,746 square foot Olympic ...
Read More...The United States Marine Corps (USMC) through Naval Facilities Engineering Command (NAVFAC) requested San Diego Gas & Electric (SDG&E) to provide and construct Energy Conservation ...
Read More...The P-111 MALS 39 Maintenance Hangar located at Marine Corps Air Station (MCAS) Camp Pendleton includes a hangar bay and attached two-story administration building with ...
Read More...