Drake Integrations served as the Commissioning Authority for the new Skyline Hills Branch Library located in San Diego, CA. The single story $13 million 15,000 sq ft library is seeking LEED Silver certification and officially opened in October 2016. Commissioning services included the Mechanical System consisting of a Chilled Water System, Heating Hot Water System, Dedicated Outside Air System Air Handling Units, Four Pipe Fan Coil Units, Ductless Split System, Multi-Purpose Room Gas/Electric Air Conditioning Units, Active Chilled Beam System, Split System Heat Pumps, DDC Controls, TAB Verification and Domestic Hot Water System. Electrical Systems commissioned included the Indoor and Exterior Lighting Controls Systems.
KPBS - Skyline Hills Branch Library Grand OpeningThe newly constructed Naval Air Station North Island Fitness Center provides Navy personnel with an 89,502 square foot fitness center, a 3,746 square foot Olympic ...
Read More...The United States Marine Corps (USMC) through Naval Facilities Engineering Command (NAVFAC) requested San Diego Gas & Electric (SDG&E) to provide and construct Energy Conservation ...
Read More...The P-111 MALS 39 Maintenance Hangar located at Marine Corps Air Station (MCAS) Camp Pendleton includes a hangar bay and attached two-story administration building with ...
Read More...